Construction Hoist Roller

  • Construction Hoist Guide Roller
  • Passenger Hoist Guide Roller
  • Material Hoist Guide Roller;
  • All kinds of rollers for construction hoists;
  • Replacement guide for Alimak;
  • High-Quality Steel Construction;
  • Wear Resistance.

Product Description

CPTC provides all kinds of rollers for construction hoists, including guide roller, counter roller, side roller, gate roller. mast section rollers, double rollers, used for GJJ/BAODA/YHX/TW/TRUMAX/ZOOMLION/CCKB/XCMG/STROS and so on. We also provide more alimak compatible parts. You can choose the different guide wheels used in different places from us with good quality, competitive prices, short delivery, and professional service.

| Installation Instructions and Notes of Guide Roller

Before installation, check whether the guide roller can rotate flexibly;

During installation, tighten the bolts to prevent looseness, resulting in falling off or uneven force, which will affect the service life of the roller.

| Advantage of Our Guide Roller

  1. Round steel material has features of wear-resisting, pressure-resisting, and super large load-bearing.
  2. The use of a thick screw design makes it more durable.
  3. We select high-quality steel bearings, which are easy to use and durable.
  4. The clasp is fixed with an anti-slip clasp for higher safety and stronger load-bearing.
  5. The color plating process forms an oxide film on the surface, which is wear-resisting and corrosion-resistant, waterproof and rust-proof
  6. Our guide roller can replace 9091697-000
  7. We also supply replacing parts of:
    Rim 604071-000;  
    Pinion 604060-005;
    Cable guide 910384-000;
    Cable guide 9099872-000;  
    Guide 9068408;
    Cable trolley 9101140;
    9106327 cable bracket;
    9030895 spring;
    9061168 pin;
    9110537-000 roller assembly.

| How to Adjust the Guide Roller of Construction Elevator?

The construction upgrade of the road roller has a guide pressure wheel and guide, are eccentric wheel.

Pressure wheel and rack backspacing in 0.5~1 mm are better, you can use a gauge or a millimeter thick plate (domestic thickness of a millimeter plate is about 0.8) placed between the pressure wheel and rack, after the pressure out of the gauge or plate, at this time the spacing is quite good.

The theoretical clearance between guide wheel and guide rail frame is 0.5 mm, and when the guide wheel is adjusted to the middle surface, there is a millimeter gap between guide wheel and guide rail, but this gap is affected by the manufacturing accuracy.

Generally speaking, when the guide wheel is adjusted, the construction hoist moves up and down, and the contact condition of the guide wheel is observed. On the premise that the guide wheel meets the requirements of perpendicularity, all guide wheels are in contact and non-contact. Attention should also be paid to the gear and rack meshing when adjusting.

| Why Should We Check the Spare Parts Regularly?

The roller of the construction elevator in the market is inlaid with an anti-falling safety device, so its safety factor is relatively high, so it can be seen that there is no big problem of carrying people.

At present, a lot of construction sites use a dual-purpose construction elevator, which is equipped with a fall safety device, mainly composed of gears, brakes and speed limiting equipment. When the equipment drops to a constant speed, its centrifugal speed limiting equipment will start, at the same time, the unit brake will also operate together, and then the braking torque will appear, The braking distance is determined by the measured amount of tightening.

The time interval for checking the anti-falling safety device shall not exceed 2 years. Even if the safety device is not damaged, it still needs to follow the regulations. After all, the service life of this kind of equipment is only 5 years. To ensure safe use, it should be checked in advance before leaving the factory, and then checked every other year. After leaving the factory, it should be treated as scrap after five years.

| Features of Construction Hoist Roller

  1. High-Quality Steel Construction: Made from strong steel for safety, reliability, and precise machining.
  2. Wear Resistance: Built to endure wear and tear, leading to a long service life.
  3. Direct OEM Factory & Quality Guarantee: Supplied directly from the manufacturer, ensuring quality control and offering a guarantee of good quality.
  4. Supply Ability: They can produce 1,000 sets of counter rollers per month.
  5. Packaging: Packed in export-standard wooden cases within a container for safe transportation.
Construction Hoist Roller 1

| Why Choose Us

CPTC (Chongqing Clipper Industrial Co., Ltd.) is a premier manufacturer of construction equipment, specializing in hoists, cranes, platforms, and rack and pinion systems. Our comprehensive product line, coupled with our deep industry expertise, enables us to deliver tailored solutions for a wide range of construction projects. There are our advantages:

Market Intelligence

CPTC isn’t just a supplier of crane parts; we’re your resource for industry knowledge. With years of experience in the market, we have a deep understanding of current trends and fluctuations in crane parts availability and pricing. We are happy to share this valuable market intelligence with you upon request, empowering you to make informed decisions for your projects.

Deep-Rooted Expertise

Fifteen years of dedicated focus on spare parts has equipped CPTC with unparalleled knowledge and experience, enabling us to provide precise solutions for diverse equipment needs.

End-to-End Service Excellence

From installation to long-term support, our comprehensive after-sales service ensures optimal equipment performance and peace of mind.

Multi-Stage Quality Assurance

Each product undergoes a comprehensive inspection regimen, encompassing raw material evaluation, in-process monitoring, and final product scrutiny.

Rapid Response and Delivery

Benefit from our lightning-fast response times and efficient logistics, ensuring your orders are processed and shipped promptly.

| FAQ

A: We are a factory.

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.

A: Yes. We are a hi-tech enterprise affiliated with the China Academy of Building Research. We have a group of engineers, who have the title of professor, senior engineer, and engineer. We can give you special designs as per the drawings of your building, helping you solve different problems faced in your projects.

A: Not exactly. Normally for us, some amendment in design to adapt to your requirements will take one week. So even for your special project, it will be about 30-40 days delivery time.