Tower Crane Structural Components

Tower Crane Wall Tie 1

Tower Crane Wall Tie

Product Description As the height of buildings increases, the horizontal arm of the tower crane may exceed the free height, in which case it is necessary to use the tower…
Tower Crane Mast Section 2

Tower Crane Mast Section

Product Description Tower crane mast is one of the main components of a tower crane, usually consisting of multiple steel pipe sections, used to support the crane’s jib and hoist…
Fishing Plate for Tower Crane Fixing Angle 1

Fishing Plate for Tower Crane Fixing Angle

Product Description The application of fishtail plates in tower cranes is mainly reflected in the connection between standard sections, which not only improves the convenience of installation and disassembly, but…
All Kinds of Tower Crane Fixing Angle 1

All Kinds of Tower Crane Fixing Angle

Product Description Angle steel for tower cranes is a type of steel commonly used in tower crane structures. Its main function is to connect the various components of the tower…

| Ordering Process

Ordering Process

| Packing & Delivery

| FAQ

A: We are a factory.

A:Yes. We are a hi-tech enterprise affiliated with the China Academy of Building Research. We have a group of engineers, who have the title of professor, senior engineer, and engineer. We can give you special designs as per the drawings of your building, helping you solve different problems faced in your projects.

A: Not exactly. Normally for us, some amendment in design to adapt to your requirements will take one week. So even for your special project, it will be about 30-40 days delivery time.

A: Yes. Our product has passed ISO certificates.

A: Yes, we have 100% test before delivery.